Study the joint between old and new.
Start where the new unit meets the house. The design team needs to understand foundations, floor elevations, walls, rooflines, windows, drainage, and the existing rooms affected by the addition.
A level floor and clean roof connection often look simple on a concept plan. Existing foundations, eaves, drainage, and interior finishes decide how much work the joint requires.
Follow services through the occupied house.
Follow plumbing, electrical, heating, cooling, and ventilation through both sides of the project. A convenient route on a sketch can require meaningful work in an occupied room, attic, crawlspace, slab, or finished yard.
Openings for pipes, ducts, wiring, and structure may extend well beyond the new rooms. The estimate should name the affected spaces and finish repairs.
Protect the family side of the project.
Plan construction around the people who remain in the home. Dust separation, temporary walls, safe entries, service interruptions, security, work hours, and restoration should be part of the written scope.
Discuss where workers enter, where temporary partitions stand, and when water or power may be interrupted. Those details matter to anyone staying in the house.
Lay out privacy before walls are fixed.
Privacy depends on entry placement, windows, sound control, laundry, outdoor circulation, and the daily routines of both households. Test those relationships before the addition outline becomes fixed.
Compare the disruption as well as the size.
Compare an attached addition with a detached ADU, a garage conversion, and a JADU using the same priorities. The smallest footprint is not always the least disruptive project.
Bring photos of the proposed connection and the rooms behind it. Call (949) 503-8004, compare the detached option, or visit the Costa Mesa ADU Contractor homepage.
Where to confirm information about an attached ADU.
An attached ADU should be checked against current City and state pages; record the address, drawing, and date covered by the answer. For an attached ADU, check the City of Costa Mesa ADU page, California HCD, and CSLB hiring guidance. For an attached ADU, our Costa Mesa ADU Contractor homepage shows how it connects with the rest of the project.